In this episode, we hear from Per Simensen, Project Manager at the NORCE Research Ullrigg Test Centre, who supported installation of the Drill Heat String (DHS).
Per describes weeks of preparing tubulars, assisting assembly, and adapting to challenging weather conditions.
“What excites me the most is the green part — the geothermal part. Being able to utilize the Ullrigg facility for the green shift that’s coming.”
His perspective highlights the operational backbone required to turn innovation into reality.
🔍 Learn more about HOCLOOP at https://www.hocloop.eu/in-a-nutshell/